Salesforce to Salesforce retirement: plan the replacement data flow

Prepare for Salesforce to Salesforce retirement in Spring ’27 with a connection inventory, replacement design and reconciled cutover.

Existing Salesforce to Salesforce connections need a replacement plan before Spring ’27. Start by listing what each connection shares and who owns those records.

Salesforce’s retirement notice, updated in October 2026, gives a phased schedule. New activation ended in Spring ’26. Bug fixes and enhancements stopped in Summer ’26, while support cases remained available. Full retirement is scheduled for Spring ’27; confirm your instance’s release date rather than assuming one global calendar deadline.

Inventory each partner connection, shared object, field mapping and filter. Record which system can create, update and delete a record. Include manual steps around the connection, such as accepting a shared record or resolving conflicting updates. Those steps are part of the workflow your replacement must support.

Then choose an architecture based on the job. Salesforce names Partner Cloud, Data Cloud One and MuleSoft as possible paths for different needs. They are not interchangeable replacements. Partner collaboration, cross-org data unification and bespoke transactional integration require different access and operating models.

Reconcile before switching the writer

Build a small replacement flow using representative records. Include a rejected update, a deletion, a duplicate and a record that changes while the connection is unavailable. Define stable identifiers so a retry cannot create a second copy.

A migration runbook should answer five questions:

  • Which system owns each field after cutover?
  • How are source records matched to existing destination records?
  • What captures updates that occur during the migration window?
  • How are failures retried and reconciled?
  • Who can pause or roll back the new writer?

Compare source and destination records by business identifiers as well as total counts. Equal counts can hide missing records and duplicates that cancel each other out. Inspect field values, relationships and access for a sample that includes awkward cases.

Avoid running two independent writers against the same fields without a conflict policy. During transition, assign ownership explicitly and log which path produced each update. A temporary observation mode can help compare results before the replacement begins writing.

Budget time for partner coordination, credentials, permissions and operating support. A technically working integration still needs someone to notice failed transfers and resolve them. Agree that responsibility before disabling the old connection.

Use the retirement date to schedule the work, but let reconciliation determine whether the replacement is ready. Our integration service can help scope the mapping, failure handling and cutover checks; the appropriate platform depends on your connection’s requirements.